RESIDENTIAL BUILDING SURVEY
OF
Mid 1800s Detached Property

FOR
Mr and Mrs A Client
Prepared by:
GEM Associates Limited
INDEPENDENT CHARTERED SURVEYORS
Marketing by:
www.1stAssociated.co.uk
0800 298 5424
CONTENTS
INTRODUCTION
REPORT FORMAT
SYNOPSIS
EXECUTIVE SUMMARY
SUMMARY UPON REFLECTION
EXTERNAL
CHIMNEYSTACKS
ROOF COVERINGS AND UNDERLAYERS
ROOF STRUCTURE AND LOFT SPACE
GUTTERS AND DOWNPIPES AND SOIL AND VENT PIPES
EXTERNAL WALLS
EXTERNAL JOINERY
EXTERNAL DECORATIONS
INTERNAL
CEILINGS, WALLS, PARTITIONS AND FINISHES
CHIMNEYBREASTS, FLUES AND FIREPLACES
FLOORS
DAMPNESS
INTERNAL JOINERY
TIMBER DEFECTS
INTERNAL DECORATIONS
THERMAL EFFICIENCY
OTHER MATTERS
SERVICES
ELECTRICITY
GAS
PLUMBING AND HEATING
BATHROOMS
MAIN DRAINS
OUTSIDE AREAS
NO PARKING
EXTERNAL AREAS
POINTS FOR LEGAL ADVISOR
APPENDICES
LIMITATIONS
ELECTRICAL REGULATIONS
GENERAL INFORMATION ON THE PROPERTY MARKET
INTRODUCTION
Firstly, may we thank you for using our services once again and your kind instruction, we have now undertaken a Building Survey (formerly known as a Structural Survey) of the aforementioned property.
As you may recall the Building Survey takes the following format; there is an introductory section (which you are currently reading), which includes a synopsis of the building, and a summary of our findings.
We then go through a detailed examination of the property starting with the external areas working from the top of the property down, followed by the internal areas and the buildings services. We conclude with the section for your Legal Advisor and also attach some general information on the property market.
As we mentioned previously we are aware that a report of this size is somewhat daunting and almost off-putting to the reader because of this. Again we would stress that the purchase of a house is usually one of the largest financial outlays made (particularly when you consider the interest you pay as well).
As always we recommend that you set aside time to read the report in full, consider the comments, make notes of any areas that you wish to discuss further and phone us.
We obviously expect you to read the entire report but we would suggest that you initially look at the summary, which refers to various sections in the report which we recommend you read first so that you get a general feel for the way the report is written.
As part of our service we are more than happy to talk through the survey as many times as you wish until you are completely happy to make a decision. Ultimately, the decision to purchase the house is yours but we will do our best to offer advice to make the decision as easy as possible.
REPORT FORMAT
To help you understand our Report we utilise various techniques and different styles and types of text, these are as follows:
GENERAL/HISTORICAL INFORMATION
This has been given in the survey where it is considered it will aid understanding of the issues, or be of interest. This is shown in "italics" for clarity.
TECHNICAL TERMS DEFINED
Throughout the Report, we have endeavoured to define anytechnical terms used. This is shown in "Courier New" typeface for clarity.
A PICTURE IS WORTH A THOUSAND WORDS
We utilise photographs and sketches to illustrate issues or features. In some photographs a pencil has been used to highlight a specific area. The sketches are not 100% technically accurate; we certainly would not expect you to carry out work based upon the sketches alone.
ORIENTATION
Any reference to left or right is taken from the front of the property, including observations to the rear, which you may not be able to physically see from the front of the property.
ACTION REQUIRED AND RECOMMENDATIONS
We have used the term ACTION REQUIRED where we believe that there are items that you should carry out action upon or negotiate upon prior to purchasing the property.
Where a problem is identified, we will do our best to offer a solution. However, with most building issues, there are usually many ways to resolve them dependent upon cost, time available and the length of time you wish the repair/replacement to last.
SYNOPSIS
SITUATION AND DESCRIPTION
This is a two storey detached property with the rear wall forming part of the boundary wall. There are gardens to the front and end of the property.
The property has been extended over the years and amended and altered and for this reason it is very difficult to date; we would estimate the mid 1800s although original parts may be much older. If the exact age of the property interests you your Legal Advisor may be able to find out more information from the Deeds.
Putting Life into Perspective!
Some of the things that were happening around the time the property was built:
1819
Factory work outlawed in England for children under nine.
1823
MacIntosh invents waterproof fabric.
1825
Railway transportation was born in England when Stephenson's 'Locomotion' ran from Darlington to Stockton, carrying 450 persons at 15 miles per hour (24km/h).
1833
The Factory Act of 1833 introduced a compulsory two hours schooling each day for children. It wasn't until the 1880 Education Act that school attendance became compulsory for all children up to the age of ten.
1837
Victoria becomes Queen of Great Britain.
1840
The First Postage Stamp
1854
Florence Nightingale pioneers modern nursing in the Crimea
1859
Charles Darwin proposes the Theory of Evolution
1878
Electric Street Lights are installed in London
EXTERNAL PHOTOGRAPHS

Left hand side view

Right hand side view

Rear View

Passageway leading up to the property

Passageway leading up to the property

Gate to the property
ACCOMMODATION AND FACILITIES
Ground Floor
The ground floor accommodation consists of:
- Large Lounge with high ceilings
- Cloakroom
- Kitchen with store
First Floor
The first floor accommodation consists of:
Outside Areas
Front and side gardens which look they will require minimal maintenance.
INTERNAL PHOTOGRAPHS
The following photos are of the internal of the property to help you recall what it looked like and the general ambience (or lack of). We have not necessarily taken photographs of each and every room.
Ground Floor

Lounge

Staircase
First Floor

Left Hand Bedroom

Right hand Bedroom

Shower Room
SUMMARY OF CONSTRUCTION
EXTERNAL
Chimneys:
Small flue
Main Roof:
A hipped pitched room clad with slates
Gutters and Downpipes:
Plastic
Soil and Vent Pipe:
Plastic
Walls:
A mixture of painted render, stonework and brickwork (assumed)
External Joinery:
A mixture of painted timber sliding sash windows and timber casement windows. Painted timber fascias.
INTERNAL
Ceilings:
Believed to be a mixture of lath and plaster and plasterboard (assumed), although we have not been able to see any of them
Walls:
Predominantly solid (assumed)
Floors:
Ground Floor: Solid underfoot, assumed to be concrete. There may be some elements of a suspended timber floor, as we believe this is what it originally was.
First Floor: Joist and floorboards (assumed)
SERVICES
The owner advised that the property has a mains water supply, mains drainage, electricity and gas (assumed).
The above terms are explained in full in the main body of the Report.
We have used the term 'assumed' as we have not opened up the structure.
EXECUTIVE SUMMARY
Summaries are dangerous as they try to précis often quite complex subjects into a few paragraphs. This is particularly so in a summary about someone's future home when we are trying to second-guess what their priorities are, so it is important the Report is read in full.
It is inevitable with a report on a building of this nature that some of the issues we have focussed in on you may dismiss as irrelevant and some of the areas that we have decided are part of the 'character' of this property you may think are very important. We have taken in the region of fifty plus photographs during the course of this survey and many pages of notes, so if an issue has not been discussed that you are interested in or concerned about, please phone and talk to us before you purchase the property (or indeed commit to purchasing the property), as we will more than likely have noted it and be able to comment upon it. If we have not we will happily go back.
Generally we found the property in below average condition considering the property's age, type and style, but much of this relates to cleanliness and the decorative state of the property and there are a few characteristics that the property has that will be very difficult / expensive / impossible to remove, which we have identified in 'The Good', 'The Bad' and 'The Ugly' summary below.
The Good
Survey reports often are full of only the faults and general 'doom and gloom', so we thought we would start with some positive comments on the property!
- The property has potential; it will make a big difference to have all the furniture removed and a general de-clutter and good clean and redecoration.
- The garden is easily maintainable.
- Within walking distance of the shops.
We are sure you can think of other things to add to this list.
The Bad
Problems / issues raised in the 'bad' section are usually solvable, but often need negotiation upon. However, a large number of them may sometimes put us off the property.
- Gutters and Downpipes
From the condition of the render we are not absolutely certain that the gutters are catching the rain. Unfortunately it did not rain whilst we were at the property and this would be the only way to check.
ACTION REQUIRED: Next time it rains heavily you need to stand outside the property and ascertain if the gutters are catching the rain water and / or leaking and amend as appropriate.
ANTICIPATED COST: We would expect this to be in the hundreds of pounds, although we have not been able to check the severity of the problem, if indeed there is one.
Please see the Gutters and Downpipes Section of this Report.
- Flat Roof
The flat roof is covered with felt; whilst
the felt is in reasonable condition it is
poorly detailed being predominately flat.
ACTION REQUIRED: You will need
to patch repair the roof. Ultimately
when you come to re-roof it we suggest
you add a fall.
ANTICIPATED COSTS: The patch repairs will probably help the
roof to last for 3 - 10 years before renewal is required.
Please see our comments in the Roof Coverings Section of this Report.
- Plastic Based Paint
The property has had a modern plastic
based paint applied. In our experience
these do not work particularly well, as they
don’t allow the property to breathe and a
brick property of this age needs to have an
element of breathability to dissipate the
damp. We could see areas where it is
starting to come away.
ACTION REQUIRED: The paint should be removed and replaced
with microporous paint, however in our experience this is very difficult /
almost impossible to remove. You can encourage the paint to come off
by using a soft brush. Ideally we would suggest you let it naturally
come away and then redecorate, but this would make the property look
in very poor condition and certainly wouldn't be very attractive.
Please see the External Walls Section of this Report.
- Dampness
We found rising damp to the property,
particularly to the rear wall. We think this
could be due to either the gutters not
catching the rainwater (that we have
already mentioned) or a high ground level.
Unfortunately we didn't actually access
this rear wall as it is in your adjoining
neighbour's garden and they were out at
the time of our inspection.
We did have access to one of the gardens and were able to take photos, but
from the photo it is very difficult to tell how the ground levels lie; however,
we can see that there is paving which does tend to carry rainwater rather
than absorb it (as the ground would), and it may be discharging onto your
property's walls.


Your neighbour's side of your rear wall.
ACTION REQUIRED: We would recommend you go round and see
the neighbours and if this is the case then a French drain along the wall
would be the solution.
We would draw your attention to the
green moss to the right hand side of the
property which indicates that little light
is being gained in this area, which will
add to the dampness. We could see that
in the past several attempts at adding a
damp proof course have been made.
We would make several comments:
The pen indicates the inserted
damp proof course and at the top
we have a vent that is often used.
We don't generally believe in rising damp being stoppable with an
inserted damp proof course and much more commonly we find the
problem to relate to difference in the ground level outside and the floor
level inside, and/or cement repointing, and/or leaking gutters.
ANTICIPATED COSTS: Investigation and the adding of a French
drain would be in the region of £1,000, although it is difficult to
estimate it as we have not actually seen that side of the property
properly.
Please see the Dampness Section of this Report and the Appendices for
more information on French Drains.
- Clean, make good and redecorate
ACTION REQUIRED: It almost goes
without saying that this property needs
de-cluttering, a good clean and
redecoration.
ANTICIPATED COST: Costs for
emulsioning would be in the region of
£1,000 - £1,250.
Gloss work tends to be the most expensive as it is labour intensive; set
aside an additional sum of a further £500 - £750.
Please see the Internal Decorations Section of this Report.
- Services
Electrics
We would date the electric fuse board as
being from the 1960s. Rewireable fuses are
now superseded. Far better fuse boards are
now available.
ACTION REQUIRED: NICEIC (or
equivalent) electrical test and report.
Replace the fuse board as soon as
possible.
ANTICIPATED COSTS: In the region of £250 - £500, depending
upon what else the tests find.
Please see the Electrics Section of this Report.
Water Pressure
When we carried out our water pressure
test by running the water we found the
pressure to be low and upstairs the tap in
the bathroom did not work at. This may
simply be furred up pipes or it may be low
pressure.
Low pressure can be a problem with a
shower (we did not try the shower). You
may wish to look into installing a pump
shower.
ACTION REQUIRED: When we spoke to the owners they advised
that the taps did not tend to work after you flushed the toilets!
Please see the Bathroom Section and Plumbing and Heating Section of this
Report.
Old Boiler
You have an older Glow-worm wall
mounted boiler. Typically these boilers
are said to last 20 years; this one is at the
end of its sell by date!
ACTION REQUIRED: You can have
the option of replacing this when it
eventually breaks down or pre-empting
it and installing a modern condensing
boiler in.
ANTICIPATED COSTS: Assuming that the existing pipework and
radiators will accept the pressure of a new boiler we would expect costs
to be in the region of £2,250 - £2,750. Quotations required.
Please see the Plumbing and Heating Section of this Report.
Drainage runs from the kitchen back down the passageway
The drainage runs from the kitchen back
down the passageway are very shallow and
may be susceptible to blockages.
ACTION REQUIRED: There is very
little you can do about this other than
obtain a set of drainage rods or get to
know someone who will carry out this
job.
Please see the Main Drains Section of this Report.
- Parking
We discussed the lack of parking and you advised that you believe you may
be able to buy parking spaces in the nearby car park. We certainly think
this would be a better option than leaving the cars on the roadside.
Please see the External Areas Section of this Report.
The Ugly
We normally put here things that we feel will be difficult to resolve and will need serious consideration.
The only item we feel could move into the 'ugly' section is the paint problem that we have identified - both the difficulty of removing it and also the way it does tend to promote and cause dampness. Equally, another item that we considered moving into this section is the dampness in the property, which we think is most likely due to difference in ground levels.
Other Items
Moving on to more general information.
Maintenance
This type of property will require ongoing maintenance and repair and a budget for such work must be allowed to ensure it is maintained in good condition. This will prevent undue and unnecessary deterioration.
DIY/Handyman Type Work
There are numerous other items that we would class as DIY or handyman type work that can be done over a period of time. We have detailed these and other issues within the main body of the report.
Purchase Price
We have not been asked to comment upon the purchase price in this instance, we have however referred you to sources of general information on the housing market within the Information on the Property Market Section, which can be found in the Appendices at the end of the Report.
Every Business Transaction has a Risk
Every business transaction has a risk, only you can assess whether that risk is acceptable to you and your circumstances. You should now read the main body of the Report paying particular attention to any "ACTION REQUIRED" points.
Estimates of Costs
Where we have offered an estimate of building costs please remember we are not experts in this area. We always recommend you obtain quotations for the large jobs before purchasing the property (preferably three quotes). The cost of building work has many variables such as the cost of labour. For unskilled labour we currently use between £75 and £100 per day (the higher costs in the city areas) and for tradesmen we use between £100 and £200 per day for an accredited, qualified, skilled tradesman. Other variations include the quality of materials used and how the work is carried out, for example off ladders or from scaffold.
If you obtain builders estimates that vary widely, we would advise the work is probably difficult or open to various interpretations and we would recommend a specification is prepared. It would probably be best to supervise the work if it is complex, both of which we can do if so required.
SUMMARY UPON REFLECTION
The Summary Upon Reflection is a second summary so to speak, which is carried out when we are doing the second or third draft a few days after the initial survey when we have had time to reflect upon our thoughts on the property. We would add the following in this instance:
We would suggest that you have a walk around to the neighbouring property to the rear and have a chat with your rear neighbour to see if they would be happy with having work carried out.
As a general comment for any work required we would always recommend that you obtain at least three quotations for any work from a qualified, time served tradesperson or a competent registered building contractor prior to legal completion.
We would ask that you read the Report and contact us on any issues that you require further clarification on.