This is a Victorian end terraced property situated
in the Prime Minister’s area of Bedford.

The
property was originally built in a lime mortar Flemish bond construction
with the exception, we believe, at high level where we believe there
is a single skin of brickwork.
Our investigations showed that the chimney is leaning and that from
within the roof space light is visible.
For chimney and gable end to ??????????????????:
Contractor to obtain permission to erect scaffolding
on adjoining land.
Contractor to supply and erect scaffolding and scaffolding
to comply with current Health and Safety standards.
Chimney and Gable end to be removed brick by brick,
bricks saved and cleaned as necessary for reuse.
Contractor to provide appropriate protection for contents
of building, depending upon the time of year that work is carried out.
Wall to be taken down to eaves level and chimneys to
be removed completely.
Gable end wall to be re-built using previously saved
bricks.
Provisional sum of £500 for small additional
bricks that may be used.
Contractor to insure for any damage that could be caused
to either the adjoining property and/or the property being worked upon
and the contents thereof. This to also include Personal Liability.
General Comment
As a general comment for any work required we always
recommend that you obtain at least three quotations for any work from
a qualified, time served tradesperson or a competent registered building
contractor.
For and on behalf of
GEM ASSOCIATES LIMITED